What Was the Challenge Faced by the Client?
In a time-sensitive situation, a new client approached GD-iTS Group, a member of the AerOceaNetwork (AON), with a critical logistics need. Their production site was running out of space, and immediate action was required to relocate a series of high-quality prefab façade elements. The challenge: to organize special transport and find secure temporary storage—on very short notice.
How Did GD-iTS Group Respond?
Thanks to their in-house fleet and storage facilities in Zaltbommel, GD-iTS Group was able to offer a flexible logistics solution almost instantly. The company deployed low loader transport to safely relocate the oversized façade units, ensuring the cargo was moved swiftly and stored without compromising its structural integrity.
This prompt execution showcased GD-iTS Group’s strength in offering comprehensive project logistics services—from urgent trucking jobs to longer-term storage solutions.
What Services Were Included in the Operation?
The services delivered under this project included:
- Rapid deployment of special transport using low loaders
- On-site coordination with the customer’s production team
- Safe and secure storage at the Zaltbommel facility
- End-to-end support by the business development team
What Were the Key Cargo and Operation Details?
Attribute | Details |
Cargo | Prefab façade elements |
Weight/Dimensions | Not disclosed (large, over-dimensional) |
Transport Mode | Low loader trucks |
Origin | Customer’s production site |
Destination | Zaltbommel warehouse |
Services Provided | Special transport, temporary storage |
Response Time | Short notice |
Network Affiliation | AerOceaNetwork (AON) |
Summary
GD-iTS Group demonstrated agility and reliability by executing a last-minute transport and storage project for a new client. With their own trucks and warehouse capacity, they ensured the oversized prefab elements were safely moved and stored—proving why they’re a trusted player in the project logistics space.